Drilling efficiency in the Permian Basin has improved dramatically; a 7,500-foot lateral well tha..., Sonic AI
“Drilling efficiency in the Permian Basin has improved dramatically; a 7,500-foot lateral well that took 25-35 days to drill in 2015-2016 can now be drilled in under 10 days.”